- Ensure that sizing and configuration is compatible:-
- Can handle supervisor consumption of 1 Ah/day (for 48v) when running WiFi connectivity (~2W)
- Monitoring between 10 - 15 cells in series
- Cell voltage between 0.5v and 5v
- Ensure that the battery pack cannot be pulled apart in cells groups risking BMS being damaged whilst connected (i.e. twin 7S being separated)
- When multiple in series (i.e. MM8) that their supply power is fully isolated from the accessory circuit
- Make sure you send us photo(s) of the visual inspection of battery and wiring so that we can see that it looks suitable and has the TestMon verification PASS
- Ensure no other cables other than USB are connected to the supervisor
- Install software and USB driver
- Upgrade firmware onto supervisor (if required)
- Run Wizard Setup to configured supervisor to suit the hardware that it will eventually be connected to
- Adopt WiFi connection to software
- Swap to isolated 5V USB plug pack for power (i.e. mobile phone charger)
- Transfer cell monitoring terminals to WMPlus, ensure no other connections except the cell terminals
- Plug in temperature sensors and ensure are reading appropriately
- Add ShuntMon and make sure has working connection
- Remove usb supply
- Double check supply pins and insert
- Add any other IO controls
- Add canbus support to Inverter/Charger
Post Install Balancing Verification Procedures
- Adjust the bypass voltage threshold below actual cell voltages to ensure that every cell bypass works
- Visually check that each balancing Red LED works odds / evens
- Detect that the heatsink increases in temperature
- Return voltage threshold back to target values.
.
.